The VoIP Lounge 25 Foot Flat Black Long Handset Receiver Curly Phone Cord with Long Lead
£49.41
Price: [price_with_discount]
(as of [price_update_date] – Details)

[ad_1]
The VoIP Lounge Universal Flat Black 25 Foot Handset Cord with long lead. Cord length is 25 feet fully stretched and approximately 3.5 feet coiled. Cords & Lengths: As a telecom industry standard, the indicated lengths of handset cords are when they are fully stretched out, not when they are coiled in their packaging. Cords are rarely utilized at their full maximum stretched length, so it’s important to choose an appropriate length when buying. Available lengths for most cords are: 7 feet (11 inches coiled / unstretched) 9 feet (15 inches coiled / unstretched) 12 feet (22 inches coiled / unstretched) 25 feet (42 inches coiled / unstretched)
Is Discontinued By Manufacturer : No
Package Dimensions : 23.6 x 13 x 2.9 cm; 50 Grams
Date First Available : 12 July 2018
Manufacturer : The VoIP Lounge
ASIN : B07FK33KRY
Item model number : 5582667555
25′ fully stretched, 3.5′ coiled (See Full Description Below)
Black Color
Brand New – Individually Bagged
[ad_2]
User Reviews
Be the first to review “The VoIP Lounge 25 Foot Flat Black Long Handset Receiver Curly Phone Cord with Long Lead”

£49.41
There are no reviews yet.