The VoIP Lounge 25 Foot Long Handset Receiver Curly Cord with Long Lead for All Nortel Meridian Norstar Business M-Series & T-Series Phone Black
£4.99
Price: [price_with_discount]
(as of [price_update_date] – Details)
[ad_1]
Brand New The VoIP Lounge charcoal black 25 foot handset curly cord for Norstar T7000, M7000, M2000 and M3900 Series phones. Cord length is 25 feet fully stretched and approximately 3.5 feet coiled with extra long lead. Cords & Lengths: As a telecom industry standard, the indicated lengths of handset cords are when they are fully stretched out, not when they are coiled in their packaging. Cords are rarely used at their full maximum stretched length, so it’s important to choose an appropriate length when buying. Available lengths for most cords are: 7 feet (11 inches coiled / unstretched) 9 feet (15 inches coiled / unstretched) 12 feet (22 inches coiled / unstretched) 25 feet (42 inches coiled / unstretched)
Extra Long Lead
Charcoal / Flat Black Color
Brand New – Individually Bagged.
Compatible with Models T7316E T7208 T7100 M7310 M7208 M7324 M3904 M3903 M2616 M2008
[ad_2]
User Reviews
Be the first to review “The VoIP Lounge 25 Foot Long Handset Receiver Curly Cord with Long Lead for All Nortel Meridian Norstar Business M-Series & T-Series Phone Black”
£4.99
There are no reviews yet.